The project scope was for a new 2500mm Dia Outfall Pipe to be submerged on the West Coast of England in the Irish Sea. The methodology was to float the pipe into position and fill the pipe with sea water to gradually submerge it onto the sea bed. This operation would put a load of stresses into the pipe flanges and welds.